DEVELOPMENT OF CALCULATION METHOD TO DETERMINE CAPACITY AND COMPONENT SELECTING OF BUCKET ELEVATOR

Ferdinan Sinaga, MAHASISWA and Sugiharto, DS and Muki Setia Permana, Ds (2011) DEVELOPMENT OF CALCULATION METHOD TO DETERMINE CAPACITY AND COMPONENT SELECTING OF BUCKET ELEVATOR. Skripsi(S1) thesis, Fakultas Teknik Unpas.

[img] Text
PREFACE.docx

Download (25kB)
[img] Text
CHAPTER I - V.docx

Download (2MB)
[img] Text
References.docx

Download (38kB)
[img] Text
VALIDATION SHEET2.docx

Download (33kB)
[img] Spreadsheet
bucket elevator 1.4.xlsx

Download (136kB)
Official URL: http://teknik.unpas.ac.id

Abstract

The need of energy consumption increases year by year for every country. But, volume or quantity of popular energy resources (oil and gas) are decreased. So, many industry makes a decision to change from those popular energy resources to other alternative energy resources like coal. Bucket elevator is one of material handling equipment which used to lift bulk material from bottom upward. But, lack in designing a bucket elevator can cause failure in operation of bucket elevator. So, to develope a bucket elevator calculation is neccesary in designing (choosing a right components) of bucket elevator and in process of calculating its capacity. Bucket Elevator Calculation can be used to calculate capacity of a bucket elevator and to select the right components. In way of developing a bucket elevator calculation, the author using CBU design data of ThyssenKrupp FordenTechnick as the comparator. And the results from camparation between Bucket Elevator Calculation and CBU design data of ThyssenKrupp FordenTechnick are similar.

Item Type: Thesis (Skripsi(S1))
Subjects: S1-Skripsi
Divisions: Fakultas Teknik > Teknik Mesin 2011
Depositing User: Irwan Kustiawan
Date Deposited: 23 Aug 2017 07:03
Last Modified: 23 Aug 2017 07:03
URI: http://repository.unpas.ac.id/id/eprint/28705

Actions (login required)

View Item View Item