Tjutju Tarliah.D, DS (2007) MINIMIZING PRODUCTION FLOW TIME IN A PROCESS AND ASSEMBLY JOB SHOP. Proceeding, International Seminar on Industrial Engineering and Management. pp. 68-73. ISSN 1978-774X
|
Text
Foreword.pdf Download (459kB) | Preview |
|
|
Text
List of Content.pdf Download (405kB) | Preview |
|
|
Text
Minimizing Production 1.pdf Download (599kB) | Preview |
|
|
Text
Minimizing Production 2.pdf Download (589kB) | Preview |
|
|
Text
Minimizing Production 3.pdf Download (483kB) | Preview |
|
|
Text
Minimizing Production 4.pdf Download (635kB) | Preview |
|
|
Text
Minimizing Production 5.pdf Download (471kB) | Preview |
|
|
Text
Promotion Committee.pdf Download (385kB) | Preview |
|
|
Text
inimizing Production Flow Time in a Process and Assembly Job Shop(1).pdf Download (6MB) | Preview |
Abstract
The research to date on assembly shop scheduling is considerably less extensive than the body of traditional job shop research, even though most jobs realistically involve assembly of some sort. Unlike simple job shops, no predominant sequencing rule has been determined for assembly shop scheduling. In this research the problem of production scheduling in a single factory is addressed. To solve this problem, a mathematical model is formulated based on a given scheduling strategy. The objective of the model is the minimization of total production flow time (makespan). A heuristic algorithm is then developed to solve the model more efficiently. The solution obtained from the model provides a production plan for getting products through the system in a timely manner. Keyword: Assembly shop scheduling
Item Type: | Article |
---|---|
Subjects: | JOURNAL |
Divisions: | Fakultas Teknik > Teknik Industri 2007 |
Depositing User: | Irwan Kustiawan |
Date Deposited: | 02 Aug 2017 08:11 |
Last Modified: | 20 May 2021 06:03 |
URI: | http://repository.unpas.ac.id/id/eprint/28442 |
Actions (login required)
View Item |