Optimizing The Number Of Welder Based On Objective Analysis And Standard Time Measurement In PT. Gearindo Prakarsa

Erwin M Pribadi, Ds and Iis Iskandar, Alumni (2011) Optimizing The Number Of Welder Based On Objective Analysis And Standard Time Measurement In PT. Gearindo Prakarsa. Proceeding 11 th National Conference of Indonesian Ergonomics Society. I-15-I-24. ISSN 2088-9488

[img]
Preview
Text
Daftar Isi.pdf

Download (600kB) | Preview
[img]
Preview
Text
1-4 Erwin M. Pribadi_Univ Pasundan_Optimizing the Number.pdf

Download (643kB) | Preview
[img]
Preview
Image
Cover Proceeding Seminar PEI 2011_Front.jpg

Download (2MB) | Preview
Official URL: http://teknik.unpas.ac.id

Abstract

Abstract.PT. Gearindo Initiative (PT. GP) is one of contractor EPCI (Engineering Procurement Construction and Installation) engaged in the construction and welding pipe for oil and gas industry. The company is working on the fabrication and installation of pipes for Onshore and Offshore oil field. In terms of stages of the production process, the welding process, have the largest contribution in these activity. PUE /PHE(Pertamina Upstream Energy/Pertamina Hulu Energi) as one of PT. GP Client, entering the capacity welder in they KPI (Key Performance Indicator). According to the authors'expectations, that the capacity listed is not the actual capacity, because the actual welder needs to complete as many targets were not specified by the Client. By doing this research, we want to solve the problem of determining the optimal number of welder using the Objective methods and standard time. By using a Standard Time can be known capacity welder real, and achievable this research goals include: 1) Determine the actual standard time. 2) Determine the capacity for each size pipe welder. 3) Knowing the truth of the welder capacity assumed in KPI compared with the productivity of research results. 4) Could be optimize the number of welder is needed for production to come in order to reach the effectiveness and efficiency of production. By analyzing the ratio of the calculated capacity of the standard time welder with welder capacity specified in the KPI, will provide information about the needs welder. From this research can be known how many optimal welder required to achieve production targets specified in KPI, thats is by 300 Dia-Inch / day. Kata kunci : Perancangan Sistem kerja, Ergomomi

Item Type: Article
Subjects: PROCEEDING
Divisions: Fakultas Teknik > Teknik Industri 2011
Depositing User: Irwan Kustiawan
Date Deposited: 14 Sep 2016 14:56
Last Modified: 14 Sep 2016 14:56
URI: http://repository.unpas.ac.id/id/eprint/12010

Actions (login required)

View Item View Item